US Website Design RFPs: Selected Development Projects

Three selected US website RFPs cover a nonprofit redesign, a school-network ecosystem and a transit website. Iditarod closes on November 2 and should be treated as a same-day decision; its expanded vendor FAQ now states staffing and included-warranty expectations. Achievement First and Wave have later November deadlines.

Coverage is selective and researched manually. This is not a complete feed or live alert service. Buyer notices can change between checks; use the buyer’s latest documents for requirements and submission.

Source review: November 2, 2026. Achievement First’s full public web RFP, Iditarod’s current homepage and downloaded RFP and expanded ten-answer FAQ, and Wave’s procurement page and linked amended documents were checked. Wave still lists the two October 21 addenda; its fuller amendment interpretation was reviewed on October 23. Separate private answers from AF or Iditarod were not obtained. Verify Iditarod’s cutoff immediately before acting; its submission section still says close of business.

Compare the website projects

Buyer and project Scope and first fit check Proposal deadline
Iditarod Historic Trail Alliance, Alaska Nonprofit website, store/donation integrations, CMS recommendations; anticipated $20,000–$25,000 budget Closes November 2, 2026: 5 p.m. AKST in the RFP; submission section also says close of business
Achievement First, CT/NY/RI school network Network site, regional hubs and 41 school sites under shared governance; enterprise multi-site evidence November 9, 2026; submission time and timezone are not stated
Wave Transit, Wilmington, North Carolina Public website, existing transit-system links/integrations, managed hosting and support November 10, 2026, 4 p.m. Eastern Time in North Carolina, clarified by Addendum 1

Iditarod: a nonprofit redesign with commerce and donor functions

The Iditarod Historic Trail Alliance seeks redesign, development and launch of iditarod100.org. The RFP asks for discovery, information architecture, design, migration, testing, training and a support plan. Its attached website map connects trail information with visitor planning, stewardship, membership, donations and a store.

Platform and delivery. Recommend two or three platforms addressing staff editing, security, commerce, donations, customer/donor data and possible future features. The requirement is not simply to apply a new visual theme to the old site. Include payment integration, migration and redirects, analytics, documentation and testing for WCAG 2.2 AA accessibility.

Pricing and evidence. The anticipated budget is $20,000–$25,000. Itemize the required work and put additional optional services in a separate budget. Provide team availability, comparable websites, a work plan, security/support approach and at least three similar-project client references. The desired launch is March 1, 2027; assess that schedule against discovery and content dependencies rather than treating it as a guaranteed award timetable.

The current vendor FAQ sharpens the estimate. The Alliance has approximately 30–40 existing pages and expects all roughly 130 documents to migrate. It will rewrite and supply existing and new page content. The current site uses Weebly and Square, with donor/member and newsletter records kept outside the website; do not assume an existing CRM integration must be migrated.

The FAQ excludes building the interactive map. Its $20,000–$25,000 base budget is for design and development; hosting, recurring apps/plugins and other ongoing costs should be separate optional lines. All hosting and data services must be US-based. Two systems for store/checkout and marketing are acceptable, with the vendor recommending suitable platforms, analytics, cookie/privacy support and data handling. The FAQ identifies federal award provisions in Appendix II to 2 CFR Part 200; read them before committing to the contract.

New staffing and warranty answers: the Alliance expects one primary editor and another one or two people trained as backup editors. Include a minimum 30-day post-launch warranty to resolve errors or issues. A 60-day warranty is preferred; longer coverage or additional support can be offered as optional budget items. Align training and ongoing support with those actual users.

Read the Alliance’s current ten-answer vendor FAQ with the original RFP.

Dates and submission. The PDF cover and schedule specify November 2 at 5 p.m. AKST; its submission section and issuer homepage say close of business. Email the proposal to iditarodhta@gmail.com as a single PDF or clearly labeled files. Questions were due October 15 and have passed. Check any subsequent written answers and confirm the cutoff if the close-of-business wording leaves doubt.

Open the Alliance’s current notice and linked RFP and the issuer-linked public RFP document.

Achievement First: a governed network of school websites

Achievement First seeks an experienced agency to build a network website, regional hubs and 41 connected school websites. The scope combines research, information architecture, design, CMS development, content migration, accessibility, multilingual publishing and integrations. This calls for multi-site delivery and governance capability rather than one small promotional site.

Qualification and response evidence. The RFP asks for three relevant multi-site, federated or enterprise CMS case studies, relevant education/nonprofit/public-sector experience, team expertise and appropriate general, cyber and professional-liability insurance. Declare proposed subcontractors, roles, locations and oversight. Explain how nontechnical staff can publish locally while shared data and brand rules remain centrally managed.

Commercial scope. Quote fixed-fee implementation by phase and a five-year total cost of ownership. Separate recurring hosting, support, licensing and optional services; the buyer specifically asks to itemize backup/disaster recovery and vulnerability management. No numeric implementation budget is published. AF requires ownership of the resulting code, designs, content and data, so identify third-party dependencies and licensing clearly.

Questions closed October 19, with answers planned for October 23; separate later answers were not reviewed here. Submit a PDF to jacquialessi@achievementfirst.org by November 9; neither an exact time nor timezone is stated, so confirm them before scheduling delivery. Proposals must remain valid for at least 90 days. Follow the seven-section proposal order and the scope/pricing assumptions checklist. Its two selection-date descriptions differ; the submission date is consistent.

Read Achievement First’s complete public website and ecosystem RFP.

Wave Transit: use the October 21 amended package

Cape Fear Public Transportation Authority, trading as Wave Transit, seeks website design, development, hosting, integration, training, maintenance and support. The amended RFP retains a practical public website using existing transit tools. A replacement trip planner and new static GTFS system are outside the base project. The new answers require the complete requested engagement; a separately scoped paid-discovery proposal is not eligible.

Delivery and access. International firms are eligible, and in-person interaction is not required. Proposed subcontractors must be identified. Work by named individuals at previous employers can support verifiable experience; firms with fewer than three external client examples remain eligible, with experience assessed in scoring. Administrative access to the old website will not be supplied, but staff will coordinate migration and cutover. Plan content collection accordingly.

Provide a staff-friendly CMS, migration, accessible current content, translation capability and access to existing rider tools. A translation widget is acceptable; translation of linked PDFs is preferred, not required. Actively used documents need the stated accessibility treatment; archived documents are treated differently in the answers. Existing real-time tracking and RideText must connect at launch; embedding tracking is preferred but a redirect remains acceptable. Price future fare-payment and future vehicle-location-provider integration separately.

Pricing and proposal controls. Include the first 12 months of hosting/support and itemize years two through five, licensing and optional work. The buyer will not disclose its budget, and payment terms are for negotiation. Cost remains 10 of 100 evaluation points. Follow the maximum 50-page main response and stated exclusions, checklist and amended Attachments A–I. The procurement-specific DBE form states no contract goal. Generative AI for design or content creation is not preferred and intended use must be disclosed in the proposal.

Insurance and notarization are now specified. Addendum 2 states the applicable workers’ compensation/employer coverage, general liability of at least $1 million per occurrence/$2 million aggregate, vehicle coverage where applicable, and cyber coverage of at least $1 million per claim and aggregate for the stated hosting/data/network exposures. Read all conditions, insurer eligibility and evidence requirements; a summary of two limits is not the complete insurance schedule.

The submission’s signatures must be notarized, but this can be done once for the complete submission; Attachment G does not need a separate notarization. Addendum 2 replaces Attachment E’s legal-status/signatory-authority wording and corrects Attachment G. Use the amended forms rather than the original versions.

Dates and route. Email the PDF response to jdodson@wavetransit.com by November 10, 2026, at 4 p.m. Eastern Time in North Carolina. Addendum 1 explicitly says all RFP and website times mean Eastern Time on the listed dates, resolving the earlier EST/EDT labels. Questions closed October 13; the October 8 meeting was optional. Review every amendment and acknowledge it in the response.

Read Wave’s current procurement page, amended v6 RFP, Addendum 1 answers and Addendum 2 insurance and form corrections.

Compare implementation effort and recurring obligations

These projects buy different delivery models. Iditarod has a stated anticipated budget and asks vendors to recommend platforms. Achievement First needs evidence of a centrally governed multi-site system. Wave wants the website to work with existing rider technology without rebuilding those systems.

Before choosing a pursuit, separate the initial build from migration, accessibility testing, integrations, content work and recurring support. State who supplies content and translations, which third-party fees are included, and which optional services are excluded from the base price. The buyer’s required pricing format determines the response; one undifferentiated website fee may hide material obligations.

Use a go/no-go assessment to compare capability, references, response effort and delivery capacity.

Find further website design and development RFPs

Check the issuer’s current procurement page and any linked amendments first. Public agencies may publish website projects through purchasing portals, while nonprofits can publish complete RFPs on their own sites, as these examples show. Search website redesign, CMS development, content migration and accessibility alongside the buyer’s name. A desired launch date or an award announcement is not a current submission window.

This page concerns website implementation work. For other creative scopes, see the existing US graphic design RFP resource and US marketing RFP resource, checking their dated source information separately.

Questions about website RFPs

Does an agency have to use the buyer’s existing CMS?

Read the actual requirement. Iditarod asks for platform recommendations; Achievement First invites a suitable architecture proposal; Wave does not prescribe a CMS. Each still requires a usable editing experience and a credible migration approach.

Does website design include hosting and long-term support?

Sometimes. Wave includes initial post-launch support and optional renewal pricing. Achievement First requires separately itemized recurring costs and five-year ownership costs. Identify what the buyer includes in implementation and what it asks you to price separately.

Can a passed question date prevent a response?

A question cutoff is different from a proposal deadline or mandatory visit. Iditarod’s and Wave’s questions have closed. Iditarod’s proposal date is November 2, the date of this check; Wave’s is November 10. Do not treat a past question cutoff as a new submission deadline or assume a listed same-day window remains open when you read it. Review existing written answers and amendments; do not assume you can reopen the question window.

Prepare the proposal from the current documents

Found an RFP worth pursuing? Collect the current scope, amendments, case-study requirements, pricing instructions and contract terms.

Start in seconds – No credit card required

Hey!

It's Javi, the founder.

There’s one thing that has helped people a lot:

👉 A summary of everything you can do with AI in proposals.

Would you like me to send you that personally?

We (DeepRFP, S.L.U.) will keep your data private and use it only to discuss our products and services, or related offerings, as per your request. You may exercise your rights of access, rectification, limitation, opposition, portability, or withdraw consent by sending an email to mydata@deeprfp.com For more info see Privacy Policy.