Two website projects remain in the shortlist. MAOF needs a migration off Webflow. Housing Assistance Council’s buyer FAQ now gives a budget, exact submission time and US registration requirement.
Coverage is selective and researched manually. Buyer notices can change between checks. Use the buyer’s latest documents for submission.
Source review: November 15, 2026. MAOF’s procurement index and posted Addendum 1, HAC’s public RFP and FAQ, and Wave’s amended procurement materials were checked. Wave’s published deadline has passed.
Compare the website projects
| Buyer and project | Scope and first fit check | Proposal deadline |
|---|---|---|
| Mexican American Opportunity Foundation, California: 26-029 | Webflow migration, CMS and UX, accessibility and ongoing support | November 19, 2026, 4 p.m. PST |
| Housing Assistance Council: Ruralhome.org redesign | US-registered vendors; accessible resource hub and staff training; $50,000–$75,000 | December 15, 2026, 11:59 p.m. Eastern, as stated in buyer FAQ |
Passed-date record: Iditarod website redesign
The November 2 deadline has passed. The published RFP gave 5 p.m. AKST in one section and close of business in another. The original vendor FAQ and RFP were rechecked; no reopening was established. Buyer website.
Closing-date record: Achievement First
The buyer still specifies November 9, 2026, without a time or timezone. This multi-site school-network procurement is excluded from the forward shortlist; check the issuer before relying on any remaining window. Original Achievement First RFP.
Passed-date record: Wave Transit website
The published response date was November 10 at 4 p.m. Eastern. No later window was established from the procurement page. The amended assignment combined website implementation, hosting and support with existing transit tools. Wave Transit procurement.
MAOF: Webflow migration and redesign
Mexican American Opportunity Foundation’s 26-029 combines migration from Webflow, a redesigned site and a CMS staff can maintain. Show comparable migration, accessibility, SEO and analytics work and plan WCAG 2.1 AA testing. The pack requires a US principal place of business and legal registration, gives California firms a preference, and allows qualified firms from elsewhere in the US.
Prepare a technical narrative of up to 10 pages and supplemental appendices of up to 20 pages, with the cost worksheet, required forms and three references. Keep pricing firm for three years and specify build and recurring service costs separately, with two possible one-year extensions. Check the professional and cyber insurance clauses before committing.
Proposals are due November 19 at 4 p.m. PST. Questions closed November 9 at 4 p.m. PST. The schedule lists consolidated answers for November 16. Follow the permitted electronic or sealed physical route in the amended pack. MAOF procurement index; posted Addendum 1 PDF.
Housing Assistance Council: resource hub and redesign
The nonprofit wants a site that makes research, training and funding information easier to find. Propose a CMS, hosting recommendation and long-term ownership costs, plus staff training, an analytics dashboard and mobile performance. The FAQ directs proposals to focus on the redesign itself and excludes ongoing hosting support. Rural Data Central, Heirs Central and Veterans Data Central are outside the redesign scope; provide links to them. Include manual and automated evidence for WCAG 2.2 AA and at least two relevant references. The buyer asks for disclosure of any AI tool use and written approval before sending confidential buyer data to third-party tools.
The buyer’s FAQ gives a $50,000–$75,000 budget range and requires registration in the United States. It clarifies a December 15, 2026, 11:59 p.m. Eastern cutoff; its timezone line prints “Easter Standard Time.” The timeline lists the date only. Email the address and subject in the RFP, and confirm the cutoff if timing is material. Kickoff is planned for February 1 and launch for September 30, 2027.
Buyer’s full public RFP and FAQ.
Compare implementation effort and recurring obligations
MAOF needs migration off Webflow and HAC needs better discovery of research and resources. Show the migration and handover work behind the redesigned pages.
Before choosing a pursuit, separate the initial build from migration, accessibility testing, integrations, content work and recurring support. State who supplies content and translations, which third-party fees are included, and which optional services are excluded from the base price. The buyer’s required pricing format determines the response; one undifferentiated website fee may hide material obligations.
Use a go/no-go assessment to compare capability, references, response effort and delivery capacity.
Find further website design and development RFPs
Check the issuer’s current procurement page and any linked amendments first. Public agencies may publish website projects through purchasing portals, while nonprofits can publish complete RFPs on their own sites, as these examples show. Search website redesign, CMS development, content migration and accessibility alongside the buyer’s name. A desired launch date or an award announcement is not a current submission window.
This page concerns website implementation work. For other creative scopes, see the existing US graphic design RFP resource and US marketing RFP resource, checking their dated source information separately.
Questions about website RFPs
Does an agency have to use the buyer’s existing CMS?
Read the actual requirement. HAC asks for a CMS recommendation and MAOF wants a move from Webflow. Each still requires a usable editing experience and a credible migration approach.
Does website design include hosting and long-term support?
HAC asks for a hosting recommendation and ownership costs for planning, while its FAQ excludes ongoing hosting support from the proposal. MAOF asks for ongoing costs to be priced separately from the build. Identify what the buyer includes in implementation and what it asks you to price separately.
Can a passed question date prevent a response?
A question cutoff is different from a proposal deadline or mandatory visit. MAOF’s question cutoff has passed. Its schedule lists consolidated answers for November 16, ahead of the November 19 proposal date. Do not treat a past question cutoff as a new submission deadline or assume a listed same-day window remains open when you read it. Review existing written answers and amendments; do not assume you can reopen the question window.
Prepare the proposal from the current documents
Found an RFP worth pursuing? Collect the current scope, amendments, case-study requirements, pricing instructions and contract terms.