One new generally actionable US pressure-washing procurement is featured for eligible HUBZone firms: the Army’s Fort Bragg requirement. HACLA’s November lead is conditional on a past mandatory site walk and retains its earlier notice review. Ashland’s October 28 date has passed.
Coverage is selective and researched manually. This is not a complete feed or live alert service. Buyer notices can change between checks; use the buyer’s latest documents for requirements and submission.
Source review: November 2, 2026. The original SAM.gov-released Fort Bragg solicitation and PWS were downloaded; scope, response instructions, qualifications and evaluation sections were reviewed. Its separate wage determination and approved-facilities workbook were identified but not audited, and a complete current amendment register was not accessible. HACLA’s public route returned a portal shell; its detailed record remains dated October 23. Ashland’s issuer page and pack were retrieved, with no extension established.
Compare the pressure-washing bids
| Buyer and work | Response deadline | First fit check |
|---|---|---|
| US Army, Fort Bragg and surrounding installations: W91247-27-Q-A001 | November 23, 2026, 10 a.m. Eastern Time | 100% HUBZone set-aside; SBA certification/SAM, local response and high-access capability |
| HACLA, Los Angeles: RFQ232501 sweeping and pressure washing | November 10, 2026, 5 p.m. PST, last verified October 23 | Conditional on October 26 mandatory-visit attendance; current pack/status unverified |
Fort Bragg: external facilities and structures
The Army buys demand-driven cleaning of buildings, bridges and tanks at Fort Bragg and surrounding North Carolina installations. The solicitation requires active SBA HUBZone certification and SAM registration at quote submission; self-certification is not accepted. It states no site visit is scheduled, so use the supplied workload and structural exhibits.
Technical evidence must cover at least three-story access capability, surface-sensitive pressure/chemical methods, damage prevention, environmental controls and priority-order response. Roof washing is expressly excluded and work is limited to the approved facilities in TE3. The PWS’s emergency category requires response within two hours during the scheduled workday and completion within eight hours unless authorized otherwise; ordinary remote mobilization may not fit.
The named project manager needs a high-school diploma, three years’ relevant building-maintenance/pressure-washing experience, a valid driver’s license and English proficiency. The quality-control manager needs one year of relevant quality-control experience. Include the required staffing/labor matrices, wage compliance and subcontracting analysis; do not assume an unrestricted subcontract model. No numeric contract budget was established.
Four volumes are required: general documents, technical capability in searchable PDF (maximum 30 pages), past performance in searchable PDF (maximum 10 pages), and pricing in Excel. Complete and sign the SF1449, include SUTA/workers’ compensation/general-liability evidence and make its pricing match the Excel schedule. Word narratives and hyperlinks are prohibited by the response instructions. Missing administrative requirements can eliminate a quote before technical evaluation.
Pricing and evaluation: the 377,000-square-foot annual quantity is an estimate, with no guaranteed minimum. Price the base year, four annual options and a six-month extension calculated from half the final option-year price. Award uses lowest-price technically acceptable evaluation after administrative checks. Provide up to five relevant contracts from the last three years, if applicable; no relevant past performance receives a neutral rating that counts as acceptable.
Dates and delivery: questions go to darius.t.moore2.civ@army.mil and john.j.machine.civ@army.mil by November 4, 2026, 10 a.m. Eastern Time. Email quotations to both by November 23 at 10 a.m. Eastern Time. The cover identifies W91247-27-Q-A001, while one cover-sheet instruction prints W91247-26-Q-A034; confirm that document-reference inconsistency through the permitted channel.
Read the official SAM.gov notice and current amendments. The released RFP/PWS support these findings, but the wage determination, facilities workbook, full incorporated clauses and any later amendment must be assessed before committing scope or price.
HACLA: attendee-only, current confirmation needed
The October 23 RAMP review showed RFQ232501 due November 10 at 5 p.m. PST, with a mandatory October 26, 10 a.m. PDT site walk at 2600 Wilshire Boulevard, C Floor Parking Garage. That meeting has passed. No reopened visit was verified; nonattendees should not assume they can respond. The QSP remains login-gated and current scope, insurance, forms and amendments were not verified. Check the original RAMP record.
Recent passed-date washing records
Ashland: the water-tower quotation was due October 28, 2026 at 2 p.m. Central Time; the retrieved pack does not establish an extension. Buyer record. Dayton: the transit-hub RFQ had an October 21 deadline and showed evaluation at the October 23 check; its current portal was unavailable. Neither is counted as current, and no award or cancellation is inferred.
Pressure-washing bid questions
Can a future deadline still be too late?
Yes. A missed mandatory visit may close participation; a federal set-aside and certification deadline can independently determine eligibility.
What should a contractor confirm before pricing?
Check surfaces, quantities, work-order priorities, access, height, water/waste handling, permitted chemicals, labor requirements and insurance. A historical workload does not guarantee future orders.
Prepare your response
Collect the current documents, amendments, eligibility evidence and cost assumptions before preparing the response in DeepRFP.