US Landscaping Bids: Selected Grounds Maintenance Contracts

A newly checked Myrtle Beach grounds-maintenance notice has an urgent participation gate: an on-time, in-person mandatory meeting on November 3. Lake City’s November lead retains dated details requiring current confirmation. Orange County’s earlier small-business waiver deadline has passed, and Elk River’s October 30 date is excluded from current stock.

Coverage is selective and researched manually. This is not a complete feed or live alert service. Buyer notices can change between checks; use the buyer’s latest documents for requirements and submission.

Source review: November 2, 2026. Myrtle Beach’s official South Carolina notice and BidNet public listing were checked; its registered-member pack was not read. Orange County and Lake City’s portals were unavailable, so their detailed findings retain the review dates stated below. Elk River’s issuer route and original RFQ were retrieved, with no later extension established.

Compare the landscaping opportunities

Buyer and work Response deadline First fit check
Myrtle Beach, South Carolina: Capital Projects grounds, 27-R0005 November 24, 2026, 2 p.m. EST in BidNet Mandatory November 3, 10 a.m. Eastern meeting; on-time attendance/sign-in
Lake City, Florida: US90 medians, 002-2027 November 10, 2026, 2 p.m. Eastern Time–New York, last verified October 23 Roadside work/traffic controls; current notice needs confirmation
Orange County, Florida: Bithlo III, Y26-1006 November 5, 2026, 4 p.m. Eastern Time–New York, last verified October 23 Conditional: 30% certified participation goal or prior approved waiver; October 26 waiver cutoff passed

Myrtle Beach: grounds maintenance with a November 3 mandatory meeting

RFP27-R0005 covers year-round grounds at the Capital Projects Building, 520 13th Avenue South: twice-monthly mowing, edging, weeding and blowing driveways/porches, fertilizing as needed and care of one plant bed.

Attend November 3, 2026, 10 a.m. Eastern, at that building. On-time attendance and sign-in are required for proposal consideration; no late or remote attendance is allowed. A later response deadline does not waive that gate. BidNet gives November 24, 2 p.m. EST; the state ad gives the same clock time without a response-zone label.

The complete BidNet documents require registration and were not read. Budget, contract term, price schedule, licensing, insurance/bonds, submission format and later amendments remain unverified. Obtain the pack before committing. Official state advertisement; buyer’s BidNet listing and pack route.

Orange County: Bithlo Area Section III landscape maintenance

The October 23 review of Orange County's IFB Y26-1006 described a five-year landscape-maintenance contract. Its public fee schedule covers mowing, planted beds, turf fertilization, litter removal, tree maintenance and removal, sodding, roadway edging and specified replacement trees. The listed quantities are estimates across five years for bid evaluation; they are not a measurement of distinct land area or guaranteed orders.

The county evaluates the all-or-none estimated total and requires a price for every line item. Include overhead, profit and all other delivery costs in the unit rates. Supply three client references for satisfactory work within the last ten years, applicable licenses and the required disclosures. The public insurance terms include $1 million general liability and $1 million auto coverage, plus other specified coverages: check the complete insurance section before committing.

Current confirmation needed: the November 2 portal was unavailable. All detailed findings below retain their October 23 review. The October 26 waiver deadline has passed; this is conditional on meeting the 30% goal through permitted certified participation or having an already approved waiver. No reopened waiver route was established.

Participation: the contract has a 30% Orange County-certified small-business participation goal. Review the permitted ways to meet it, including qualifying self-performance, and the documentation required. If seeking a full or partial waiver, the previously reviewed portal set a good-faith-effort submission deadline of October 26 at 4 p.m., Eastern Time, ahead of the bid deadline. A waiver is subject to county review, not automatic.

Current amendments matter: Addendum 1 changed the October 12 pre-bid meeting from mandatory to non-mandatory, so missing that meeting alone does not exclude a new bidder. Addendum 2 adds a contract certification concerning the use of county funds for diversity, equity and inclusion activities. Addendum 3, issued October 22, removes “construction” from the SBE services provision and changes section 4.5’s prime-contractor payment verification to quarterly reporting through B2Gnow, due by the fifth day of each quarter. The 30% goal remains. Section 4.4’s subcontract wording still refers to verifying monthly payments within five business days of notification; do not assume every subcontract obligation has become quarterly. Reconcile those requirements in the current pack. Questions closed October 14. Submit electronically through OpenGov by November 5 at 4 p.m., Eastern Time–New York and acknowledge the current addenda.

The public portal terms and fee schedule were reviewed October 23. At the October 16 detailed review, supplier questions about quantities and units, maintenance boundaries and tree-removal pricing remained unanswered; that is not a fresh finding that they remain unanswered today. Review current answers before pricing. These questions do not establish that the specifications are wrong. The separate technical scope, location list and boundary attachments were identified but could not be opened in this review; obtain and assess them before estimating frequencies, access constraints or production costs. Use the official Orange County project, documents and addenda.

Lake City: four landscaped medians on US Highway 90

Current confirmation needed: its November 2 portal was unavailable. The notice was last checked October 23; scope retains October 16. The response date and later amendments need confirmation before relying on this lead.

Lake City seeks an annual contractor for four median islands along roughly one mile east of the Interstate 75 interchange. The scope combines mowing and debris removal at least twice monthly with bed care, palm trimming, fertilization, mulch and year-round flowering plants. The contractor also inspects irrigation twice a month; repairs require city authorization and are invoiced separately.

This is roadside work with traffic-management responsibilities. Include the labor and materials needed to comply with Florida Department of Transportation maintenance-of-traffic practices, along with equipment, supervision, disposal and required permits. The city requests a qualifications statement and three similar-project references from the last five years. Its terms provide a 5% preference for qualifying Columbia County residents or businesses; that is a preference, not a general exclusion of other bidders.

Price and respond: the portal requests an annual price for the maintenance service. The contract is scheduled to start in January 2027 for one year, with two possible one-year renewals by mutual agreement. No bid budget is stated, and payment and performance bonds are expressly not required. Review insurance, the certifications and all required response fields before uploading.

Submit through OpenGov by November 10 at 2 p.m., Eastern Time–New York. There is no pre-bid meeting. The October 23 overview gave October 26 at 4 p.m. for questions, now passed. At the October 16 specification review, section 2.4 instead said November 2 at 4 p.m.; that clause was not freshly reverified. That old discrepancy does not establish a new question window; check any formal clarification. The November 2 answers date in the overview is not a new question cutoff. Read the official Lake City solicitation.

Passed-date record: Elk River

The city/utility turf RFQ was due October 30, 2026. The PDF gives no clock/zone; the earlier listing showed 11:59 p.m. with no zone. It is excluded from current stock; no later extension, award or cancellation was established. Original issuer record.

Check participation before pricing routes

Confirm visits, licenses, references, certification goals and earlier waiver windows first. Then price actual site boundaries, frequencies, unit quantities, traffic controls, seasonal work and disposal. Estimated five-year quantities are not guaranteed orders.

Landscaping bid questions

Does the response deadline include the required visit?

No. Myrtle Beach’s meeting precedes its proposal date by three weeks. A supplier who misses a mandatory event needs an explicit buyer reopening or waiver, not an assumption based on the later closing date.

Can a passed waiver deadline affect eligibility?

Yes. Orange County’s previously checked waiver cutoff was October 26. Meet the goal through permitted participation or confirm an existing approved waiver; do not assume a late request will be accepted.

Prepare your response

Collect current documents, participation evidence, staffing and route-cost assumptions before preparing the response in DeepRFP.

Start in seconds – No credit card required

Hey!

It's Javi, the founder.

There’s one thing that has helped people a lot:

👉 A summary of everything you can do with AI in proposals.

Would you like me to send you that personally?

We (DeepRFP, S.L.U.) will keep your data private and use it only to discuss our products and services, or related offerings, as per your request. You may exercise your rights of access, rectification, limitation, opposition, portability, or withdraw consent by sending an email to mydata@deeprfp.com For more info see Privacy Policy.