Two selected US GIS procurements cover different delivery models: Henry County’s new aerial mapping and LiDAR project, and Edmond’s ongoing GIS maintenance with local field verification. Biddeford’s November 2 electronic deadline is excluded from the forward shortlist; later hard copies do not reopen electronic entry.
Coverage is selective and researched manually. This is not a complete feed or live alert service. Buyer notices can change between checks; use the buyer’s latest documents for requirements and submission.
Source review: November 2, 2026. Henry County’s current issuer notice and complete 21-page RFP were read. Edmond’s public portal and answer were retrieved; its detailed pack findings retain October 23. Biddeford’s new Addendum 2 and all 19 Round 2 answers were read with the earlier reviewed pack. Urbana and Hollywood’s portals were attempted but no current extension was established.
Compare the GIS opportunities
| Buyer and work | Response deadline | First fit check |
|---|---|---|
| Henry County, Virginia: countywide mapping, 26-11183-A306 | November 18, 2026, 3 p.m. Local Prevailing Time | Aerial acquisition, QL1 LiDAR, six-inch imagery and planimetric updates |
| Edmond, Oklahoma: GIS Data Updates, RFP27-008 Addendum 1 | November 25, 2026, 2 p.m. CT in portal; PDF labels CST | Field-survey capability, rapid turnaround and cyber insurance |
Henry County: aerial mapping and LiDAR
The County seeks new color aerial imagery and updated planimetric features across approximately 384 square miles. Acquisition is scheduled for February/early March 2027. The scope includes QL1 airborne LiDAR at a minimum eight points per square meter, six-inch orthoimagery, updated features and changed-area two-foot contours. Martinsville is excluded from specified planimetric/terrain-update phases; use the Contract Map and phase boundaries.
This requires aerial acquisition and photogrammetric production capability. The County supplies and coordinates ground control; the contractor still needs calibrated sensors, GNSS/IMU, processing, QA and reporting. Deliver classified LAS 1.4 data, DEM/breaklines, metadata, imagery and associated products. County ownership and up-to-five-year storage of project imagery/data apply. Manual mosaic seam-line methods and uncompressed TIFF production are specified; an ordinary GIS editing offer alone will not cover this scope.
Provide an approach, implementation schedule, firm/personnel qualifications and similar-project references from the last five years. Comparable performance carries 30 points; approach, capacity and resources carry 20 each, and personnel continuity 10. No numeric budget or priced response schedule was identified. The initial contract is one year from award with three possible annual negotiations; additional similar work is discretionary. Required forms include non-collusion, SCC registration or applicable explanation, and subcontractor disclosure even if none are used. Professional liability is at least $1 million per claim/$2 million aggregate, alongside specified general, auto and workers’ compensation coverage.
Submission: choose exactly one route by November 18, 2026, 3 p.m. Local Prevailing Time. Deliver one paper proposal plus USB in a marked sealed envelope to the specified Purchasing Department address, or use registered-supplier eVA submission with at most two PDFs totaling 25 MB; no ZIP, fax or emailed proposal. Follow separate proprietary-information instructions. The reviewed RFP states no mandatory visit or numeric question cutoff; direct permitted inquiries to Tim Pace at tpace@henrycountyva.gov. Check amendments before response. Current issuer notice; complete mapping RFP.
Edmond: GIS maintenance with field-survey and turnaround obligations
Edmond’s RFP27-008 GIS Data Updates Addendum 1 is marked Issued in its official portal. The work updates parcels, easements, water, wastewater, storm, planning and other GIS layers as construction and development occur. It combines source-plan conversion, field verification and maintenance of an Esri distributed geodatabase; it is broader than preparing standalone maps.
The current portal and its single published answer were checked November 2. Detailed amended-RFP and selected-appendix findings below retain their October 23 review; the attachment downloads and pricing workbook were not freshly reviewed.
Technical delivery. The amended RFP requires legal-description and survey checks within 24–48 hours and specifies survey-grade GNSS field verification tied to City monuments. Section 9.1.2 calls for ±3 cm horizontal accuracy; the overview also contains broader ±1-foot wording and separate vertical requirements. Reconcile the applicable feature-level requirements in sections 9.1/9.2 and Appendix B rather than pricing from the looser overview alone. Data integrity includes preserving Cityworks/Unity ObjectID and FacilityID attributes.
Evidence and price. Prepare at least three comparable customer references from the last three years, a project approach, technical operations and QA plans, essential-personnel resumes and the detailed Appendix A pricing worksheet. Include travel and direct/indirect delivery costs. The buyer evaluates price, implementation, profile, qualifications/responsiveness and references but does not disclose numerical weights. The reviewed procurement does not state a numeric contract budget; third-party estimates are not buyer budgets. An annually renewable services contract is anticipated, subject to agreement.
Insurance is a real fit check. The amended RFP requires workers’ compensation/employer coverage, general/public liability and property-damage coverage, and $5 million aggregate cyber liability. The published answer says the City prefers $5 million but might reconsider depending on the proposed data-update approach. That is not an approved waiver or an automatic reduction to $1 million. Check all limits and required evidence against the current pack.
Response route and dates. Submit electronically through the City’s Ionwave bidding system; the RFP rejects facsimile and hard-copy proposals. The portal gives November 25, 2026, 2 p.m. CT; the PDF cover labels it CST. Questions closed October 23 at 5 p.m. CT in the portal. A paragraph in the PDF says 2027, while its cover, schedule and portal say 2026; do not treat that isolated year as an extra question window. The attachment description directs questions through the bid portal; only formal written addenda are binding.
Open Edmond’s official GIS opportunity, amended RFP, appendices and published answer. The pricing workbook and every technical feature definition were not independently audited in this review; read the complete package before finalizing scope and price.
Biddeford: November 2 closing record
The electronic proposal deadline was November 2, 2026, 2 p.m. Eastern Time; three hard copies follow by November 5. The later paper delivery date is not a new entry window. No extension was established, and this record is excluded from current stock.
New Addendum 2 requires proposers to describe ordinary and emergency support, escalation, response commitments and extra charges without imposing numeric uptime/restoration targets. Round 2 answers, labeled October 26 Working Draft, clarify contractor-provided licenses, US-based personnel/hosting/data/backups, qualified out-of-hours assistance beyond voicemail, hosted backup/recovery duties and annual fixed pricing. Read these with the binding addenda; the earlier own-personnel/no-team rule and three directly served US municipal references were not reopened.
Issuer posting; Addendum 2; Round 2 answers.
Other passed-date competitions
Urbana FY2027-RFP-210 had an October 19, 2026, 2 p.m. Central deadline; Hollywood RFQ-433-26-SA had October 22, 5 p.m. Eastern. Both showed pending at the October 23 check; their current status was not established. Neither is counted as a new invitation. A passed deadline establishes neither award nor cancellation. Urbana; Hollywood.
Check your delivery model
Aerial mapping needs acquisition assets, seasonal capacity and measurable QA. Maintenance needs integration, local verification and turnaround. Hosted services need licensing, support and continuity. Compare the actual deliverables, native formats, ownership and insurance before investing in a proposal.
GIS RFP questions
Can a small GIS consultancy bid directly?
Size alone determines neither eligibility nor capacity. Check the required personnel, field or acquisition equipment, references and permitted subcontracting model in each pack.
Does a later hard-copy date extend electronic entry?
No. Biddeford separately required its complete electronic proposal on November 2 and physical copies by November 5. Only a formal buyer change can move the controlling deadline.
Prepare your response
Collect current amendments, technical appendices, qualification evidence and price assumptions before preparing the response in DeepRFP.